iZone Smart Bed Set-up
Remove the compressed mattress from Box 1.
Unbox Box 2 for the mattress components.
Remove the Foam cubes, Air cores, and Air processor with Remote.
Place the compressed and rolled mattress on your adjustable base, platform bed frame, or foundation.
Cut the vacuum-sealed plastic and unroll it. Avoid using sharp tools that may damage the material.
Allow the mattress to expand fully in less than one hour.
Remove the plastic cover and set aside the foam comfort layer to install at a later step.
Center the expanded mattress on your foundation or frame with the opening in the cover for the air hoses at the head of the bed.
No need to take the cover off. Unzip and roll the cover to the head of the mattress.
Remove the fire barrier and set it aside to install at a later step.
Place the two uninflated air cores side by side in the support tray and ensure the hoses face the head of the bed.
Insert the air hoses through the hole at the head of the bed. Make sure hoses are not kinked. All excess hose should be pulled through the opening.
Place the air processor under the hoses protruding from the head of the bed. Connect the RH and LH hoses to the corresponding RH and LH nozzles on the processor. Hoses will ‘click’ when securely connected.
Connect the power cable to the air processor and plug the processor into a surge protector.
Recenter the air cores and place the foam cubes in the head and foot sections of the foam support tray.
Fully inflate the air cores by pressing the memory button on the remote for each side. Standing at the foot of the bed, "R" operates the right side and "L" operates the left side.
Return the foam comfort layer to the top of the inflated air cores. Make sure the foam comfort layer is centered.
Cover the foam comfort layer with the fire barrier down to the support tray, and make sure the elastic bands of the fire barrier cover are tucked under the entire foam support tray to prevent bunching.
Pull the top cover back over the fire barrier and re-zip it into place. You are now ready to enjoy your new iZone Smart Bed. Please allow up to 72 hours for the foam to completely expand to its original size and shape.